| Tutor: | Johannes Demel |
| Type of Thesis: | Master's thesis (MSc) |
| date of end: | 01/2018 |
| Student: | Sven Schmidt |
| Status: | finished |
| ANT-shelfmark: | |
| Abstract: | Scheduling for Closed-Loop-Control Applications is a critical task, because late packets are lost due to the real-time requirement. |